Successful project logistics is based on rigorous, detailed planning, attention to detail, superior execution and hands-on control.
Project Engineering Gallery
- Load bearing capacity calculation of a concrete frame bridge
- Load bearing capacity calculation for an underground pipe
- Crane study for the unloading of barges on the Saale River
- Load bearing capacity calculation of a steel arch bridge
- Turning radius planning for a 48 meter long convoy
- Bridge calculation for 150 ton transport
- Calculation of a container in transport state
- Temporary bridge over the German high speed rail line (Deutsch Bahn ICE line)
- Load bearing capacity calculation of a composite frame bridge
- Visualization of the reloading of transformer from a pontoon to SPMT
- Load bearing capacity calculation for a steel composite bridge
Permata Dunia Sukses Utama

To meet its increasing production goals, PDSU purchased a refinery and warehouse in Singapore that had closed down. PDSU wanted a logistics provider that could move the entire plant from Singapore to Cilegon.
Larsen & Toubro

Larsen & Toubro were undertaking a new development project on Saadiyat Island. Saadiyat Island is a 27-square-kilometer natural island—half the size of Bermuda—and lies only 500 meters offshore of Abu Dhabi, the United Arab Emirates’ capital city. The island can be reached by road and sea. Normal cargo and truckloads not exceeding 90 tons can be driven to the island without any problems. Access by sea—a distance of 12 nautical miles—is very challenging: there are only three jetties, designed for small passenger ships and for small barges, tugs, etc., but no cargo movements have taken place before.